Bralirwa plans 250 million-litre beverage factory in Rwanda

The proposed brewery will nearly double the capacity of Bralirwa’s existing Rubavu facility, adding major production infrastructure as the company reports strong financial growth.

RWANDA – Bralirwa Plc has received government approval to develop a new beverage manufacturing plant in Rwanda’s Rwamagana Industrial Zone, with a planned annual capacity of 250 million litres of beer and soft drinks. 

The Greenfield Brewery Project was approved after Cabinet endorsed an investment agreement between the Government of Rwanda and Bralirwa at a meeting chaired by President Paul Kagame on November 26, 2026. 

Preliminary technical information puts the facility’s ultimate annual production capacity at 2.5 million hectolitres.  

Beer production will account for 1.5 million hectolitres, equivalent to 150 million litres, while the remaining one million hectolitres, or 100 million litres, will be allocated to soft drinks.  

The production mix assigns 60% of capacity to beer and 40% to soft drinks, according to published preliminary project specifications. 

The plant will be built in Eastern Province and will add to Bralirwa’s existing beverage manufacturing operations.  

Planned infrastructure includes a brewhouse, packaging hall, fermentation and beer storage tanks, raw-material warehouses and facilities for handling production materials. 

The project will also include a wastewater treatment plant and supporting infrastructure for large-scale beverage production. 

The proposed Rwamagana brewery will have almost twice the annual capacity of Bralirwa’s existing facility in Rubavu District, which borders the Democratic Republic of Congo.  

The Rubavu brewery had capacity of approximately 1.3 million hectolitres, or 130 million litres, following an expansion in 2023. It received an additional production line in 2024, although the extra capacity was not publicly disclosed. 

The project’s technical information also identifies Lake Muhazi as a proposed source of industrial water. Plans include water abstraction and discharge pipelines connecting the facility to the lake, as well as wastewater treatment and a stormwater management pond. 

However, details of planned water abstraction volumes and environmental safeguards have not yet been publicly established. 

Bralirwa sold 2.799 million hectolitres of beverages in 2025, according to company figures. It employs more than 400 people and distributes products across Rwanda’s 30 districts. The Rwamagana development would add a third production location and expand the company’s manufacturing infrastructure. 

The investment comes as Bralirwa reports growth in its business. In the first half of 2026, revenue increased 20%, supported by higher beer and soft drink sales volumes, price adjustments and continued demand for premium products. 

Profit after tax rose 37.6% to Rwf25.3 billion, compared with Rwf18.4 billion in the corresponding period of 2025. 

The proposed plant would increase Bralirwa’s capacity to serve Rwanda’s beverage market across beer and soft drinks, while adding manufacturing infrastructure in the country’s Eastern Province.  

The project’s final development and operating details, including its water requirements, have not been publicly provided. 

Sign up HERE to receive our email newsletters with the latest news and insights from Africa and around the world, and follow us on our WhatsApp channel for updates.

Newer Post

Thumbnail for Bralirwa plans 250 million-litre beverage factory in Rwanda

IDC considers US$259.5M investment in Tongaat Hulett rescue deal

Older Post

Thumbnail for Bralirwa plans 250 million-litre beverage factory in Rwanda

PepsiCo India invests US$93.4M in India snack manufacturing plant